Health → More work done
So at this point I’ve got the living room pretty much done. The paint looks good and I hung one set of track lighting. I want/need to hang another set but I’m going to wait untill I have everthing moved in first. I need them to line up properly. The stairwell is done. Although it’s just slightly possible to see a hint of pink here and there I don’t feel like putting on another coat. It will do. Esp once I have some photos hanging up. I stripped the wallpaper out of my room and put on a layer of primer. I decided I only need to do one coat of primer instead of two like downstairs. Which is good because I just had enough left over. In fact I didn’t get to put it on as thick as I’d have liked. I was literally scrapping the bottom of the bucket. I’m going to swing by home depot tomorrow and pick up paint, nails, screws, and other hanging stuff. Between coats I’m going to try and work on getting the desk area and closet door taken care of. We’ll see how much of it I can get done. I reserved a truck on thursday because it’s going to rain on saturday and I don’t want to move in the rain.
